ADU specialists for [Your City] · Free 15-min feasibility call · 12–18 months from first call to keys

ADU services & packages · [Your City]

Pick the level of help
you actually need.

Feasibility, permit set, and full-service ADU design. Transparent pricing, real numbers up front, and a clear path from your first call to the keys.

What it costs

No surprises.
Real numbers, up front.

Most architects make you book a call to find out a price band. We don't. The full range we work in is below, and our feasibility report tells you which band your lot lands in.

$

$280–$340/sqft

Studio & small 1BR · 350–600 sq ft · simple finishes

  • · Detached new-build, single story
  • · Standard finishes
  • · Approx total: $130k–$220k
Most projects

$$

$340–$440/sqft

Family-scale 1BR–2BR · 600–900 sq ft · upgraded finishes

  • · Detached new-build, single or 1.5 story
  • · Custom kitchen, full bath, real laundry
  • · Approx total: $250k–$400k

$$$

$440–$560/sqft

Larger / two-story / garage conversion · 900–1,200 sq ft · premium

  • · Two-story or complex site
  • · Premium materials & appliances
  • · Approx total: $400k–$680k

Hard-cost ranges (architecture, structural, MEP, GC). Excludes utility connections, financing, and your specific lot conditions. Your feasibility report narrows the number for your address.

Three ways to work with us

Pick the level of help you actually need.

Step 1

Feasibility

$1,500

Flat fee, ~3 weeks

  • +Site visit + measure
  • +Zoning + code analysis
  • +3 conceptual siting options
  • +Refined cost band for your project
  • +Credit applied to next phase
Start here →
Most popular

Step 2

Permit Set

8–11% of build

3–5 months

  • +Schematic + design development
  • +Construction drawings
  • +Structural & MEP coordination
  • +Permit submission & revisions
  • +Bid set for 2–3 contractors
Get a quote →

Step 3

Full Service

12–15% of build

12–18 months total

  • +Everything in Permit Set
  • +Contractor bid leveling
  • +Construction administration
  • +On-site visits, RFI & submittals
  • +Punch list + final walkthrough
Talk to us →

Process

12–18 months from
first call to keys.

01

Feasibility

~3 weeks

Site visit, zoning analysis, 3 conceptual siting options, refined cost band.

02

Schematic Design

~6 weeks

Plans, elevations, materials. Two design sessions to refine the layout you'll actually live with.

03

Permit & Bid

~3–4 months

Construction drawings, permit submission, revisions, contractor bidding to 2–3 trusted GCs.

04

Construction

~6–9 months

Site visits, RFI/submittals, GC coordination. We're on call for the duration of the build.

05

Move-in

Day 1

Final walkthrough, punch list, certificate of occupancy. Then you're done. (Or you list it.)

FAQ

Common questions.

Can I rent out my ADU on Airbnb?+

In most [State] jurisdictions, short-term rental of a primary-residence ADU is allowed but regulated (registration, occupancy taxes, primary-residence requirement). Long-term rental (30+ days) is universally permitted. Our feasibility report flags STR rules specific to your address.

Do I need to live in the main house?+

Owner-occupancy requirements vary by city. In recent years, [State] reform has loosened or removed this rule in many jurisdictions, but not all. Confirmed for your address in the feasibility report.

How much will it actually cost?+

For a typical [Your City] lot, $$ ($340–$440/sqft) covers most family-scale ADUs with quality finishes. Two-story builds, garage conversions with structural complications, and small lots that require deep site work push toward $$$. The feasibility report narrows your specific number.

How long does it take?+

12–18 months from feasibility kickoff to certificate of occupancy is typical. About 4–6 months of that is design + permitting; the rest is construction. Garage conversions are usually faster; complex two-story builds, slower.

Can you handle the GC, too?+

We don't build, but we partner closely with three to five GCs we trust for ADU work in [Your City]. We bid your project competitively, level the bids, and stay on through construction administration so you're never alone with the contractor.

Will it raise my property taxes?+

Yes, typically the assessed value increases by the cost of the ADU minus depreciation, with a corresponding tax increase. We can introduce you to local tax professionals who can model the exact impact for your situation.

Ready to find out
if your lot can fit one?

Free 15-minute feasibility call, or send your address for a written report.